Award Categories | The Award | Eligibility | Application

Quality Building Award (QBA) 2012 is open for nominations under the following six categories:

CATEGORIES

NOMINATION REQUIREMENTS

1) Hong Kong Residential
    (Single Building)
  • Nominated single building must be a single independent structure not part of a complex containing other buildings.
  • Major Function of the nominated building should be for residential use.
2) Hong Kong Residential
    (Multiple Buildings)
  • Nominated multiple buildings must be a group of buildings of similar kinds, which form a residential complex.
  • Major Function of the nominated multiple buildings should be for residential use.
3) Hong Kong Non-Residential
    (New Building)
  • Major Function of the nominated new building must be for non-residential use or include non-residential use.
4) Hong Kong Non-Residential     (Renovation and Revitalization of
     Existing Building)
  • Nominated existing building must have undergone and completed a renovation, restoration, revitalization or similar process to its physical structure and/or communal facilities.
  • Major Function of the nominated existing building should be for non-residential use.
5) Project Outside Hong Kong
     (Residential)
  • Nomination must be outside the territorial limits of the Hong Kong Special Administrative Region.
  • Major Function of the nominated building should be for residential use.
  • Nomination must be made by the project team.
  • At least one member of the project team must be a registered member of any of the nine professional organizing institutes of QBA 2012.
6) Project Outside Hong Kong
     (Non-Residential)
  • Nomination must be outside the territorial limits of the Hong Kong Special Administrative Region.
  • Major Function of the nominated building should be for non-residential use.
  • Nomination must be made by the project team.
  • At least one member of the project team must be a registered member of any of the nine professional organizing institutes of QBA 2012.

* Nominated buildings should be practically completed in the period between 1 January 2009 and 30 June 2011.